LINESERVE

Colocation — Kampala, ug-1a

Colocation in Uganda

Colocation in carrier-neutral, Tier III data centres — close to home.

You already own the hardware. What you are buying is everything around it: power that holds when the distribution network does not, cooling that runs at three in the morning, a door that opens only for people on a list, and someone in the building who can reseat a drive while you are still on the phone. Getting the boxes here is its own story, because Uganda has no coastline — they land at Mombasa or Dar es Salaam and travel inland by road or rail before they cross into the country. Plan that journey once, with your clearing agent and with us, and our engineers receive the shipment, rack it, cable it and label it against the elevation you sent. Tell us the footprint, the power draw and the term, and we will quote it in shillings.

FromUGX 373,000/month per U
  • Single U through quarter, half and full racks — private cages and suites on request
  • Redundant A and B power feeds, with a metered allowance sized to your footprint
  • Remote hands for reboots, reseats, recabling and installs
  • Data residency for Uganda's Data Protection and Privacy Act — your data stays in-country
  • Quoted and invoiced in shillings, on a Ugandan tax footing your finance team can file

Billed in UGX · Data stays in-country

Kenya

ke-1a · Nairobi

Tanzania

tz-1a · Dar es Salaam

Nigeria

ng-1a · Lagos

Don't want to own the hardware? See Dedicated Servers

Space & power

From a single U to a private cage

Rent exactly the space you need, with the power and connectivity to match. Priced monthly, billed in your currency, on standard commitment terms. Power allowances and cross-connects scale with your footprint.

Single U

A box or two.

UGX 373,000/mo

Hosted in Nairobi, Dar es Salaam, Lagos & Kampala

  • 1U of rack space
  • 1A / 120 W
  • 1 Gbps port
  • Remote hands available
  • IP transit allowance
Reserve Single U

Quarter rack

Small deployments.

UGX 3,725,000/mo

Hosted in Nairobi, Dar es Salaam, Lagos & Kampala

  • 10U of rack space
  • 500 W power
  • Cross-connect included
  • Remote hands available
  • IP transit allowance
Reserve Quarter rack
Most popular

Half rack

Growing footprints.

UGX 7,823,000/mo

Hosted in Nairobi, Dar es Salaam, Lagos & Kampala

  • 21U of rack space
  • 1 kW, A+B redundant
  • Cross-connect included
  • Remote hands included
  • IP transit allowance
Reserve Half rack

Full rack

A full environment.

UGX 15,645,000/mo

Hosted in Nairobi, Dar es Salaam, Lagos & Kampala

  • 42U of rack space
  • 3 kW, A+B redundant
  • Dedicated uplink
  • Remote hands included
  • IP transit included
Reserve Full rack

Private cage

Cages, suites, scale.

Quote
  • Custom space
  • Custom power
  • Custom connectivity
  • Dedicated remote hands
  • Custom transit
Request a quote

Prices exclude VAT and setup. Power above your footprint's allowance is UGX 1,863,000 per kW per month. Colocation is offered on standard commitment terms; cross-connects and additional transit are quoted per requirement. Local currency figures are indicative and confirmed on your quote.

Network

A rack in Kampala is a rack on the inland side of every ocean crossing

Uganda is landlocked, and for a colocation buyer that is not a piece of trivia — it is the whole reason the address matters. There is no submarine cable landing station in the country. Every bit of international capacity reaching Kampala has been hauled overland first, east across Kenya from the Mombasa landings or south across Tanzania from Dar es Salaam, roughly 900 to 1,000 kilometres of terrestrial fibre through a neighbouring state before it arrives. Put your equipment abroad and your Ugandan users pay that haul plus an ocean crossing on every request, in both directions, forever. Put it in Kampala and they pay neither.

The routes in are worth knowing by name, because they decide how resilient the country is rather than how fast any one packet is. Bayobab runs 260 kilometres of fibre from Kampala to Tororo along the Uganda Railway corridor, interconnecting into Kenya's national long-distance network from Mombasa via Malaba and marketed at more than a terabit per second. SEACOM opened a Nairobi–Kisumu–Kampala route with border crossings at both Malaba and Busia, an alternative inland path through Narok, Kericho and Kisumu, and automatic protection that moves traffic to the other path when one breaks. Roke Telkom and Paratus run a 2,000-kilometre corridor from Goma through Kigali, Kampala and Nairobi to Mombasa. NITA-U has extended the National Backbone Infrastructure to Mutukula, which points Uganda at Dar es Salaam instead. Four independent paths to two different coastlines is a materially better picture than Uganda had a decade ago, and it is the picture your rack sits behind.

Domestically, a router in Kampala sits at the head of the country. The UCC put Uganda's national fibre optic network at 80,257 kilometres as of June 2026, up from 71,740 three months earlier, and the National Backbone Infrastructure reaches regional centres and the border posts — Gulu, Mbarara, Mbale, Jinja, Arua, Hoima. For an operator whose customers are strung along those corridors, or whose sites sit in the Albertine, equipment in Kampala is where the traffic is already going.

On the user side, Uganda is a two-network country. MTN Uganda and Airtel Uganda hold more than 90% of mobile subscriptions between them, roughly balanced, with Africell, Lycamobile, Uganda Telecom and the new entrant Savanna taking the remainder. The UCC counted 64.6 million registered mobile subscriptions in the quarter ending June 2026, 49 million of them active, and 19.7 million active mobile internet subscriptions. Neither of the two large networks is one you can afford to design around, so what matters is breadth of reach rather than a single relationship — and breadth is a function of being in the city where the networks already meet.

0

Submarine cables landing in Uganda

4

Independent international fibre routes out of Kampala

380G

Capacity connected at UIXP, Kampala (PeeringDB)

80,257 km

National fibre optic network (UCC, June 2026)

Where Ugandan networks meet each other

UIXP, the Uganda Internet Exchange Point, has run since 2001 as a non-profit and a member of the African IXP Association, operating a layer-2 fabric reachable from two interconnected locations in greater Kampala, with its switch at Communications House in a room the UCC provides at no cost. PeeringDB records 26 peer networks, 29 connections and 380 Gbps of connected capacity at around 86% IPv6 — Akamai and Meta at 100G each, MTN Uganda at 30G, with Liquid, Tangerine, Paratus, SEACOM and RENU connected. For an operator colocating its own router, being in Kampala is what makes local interconnection a decision rather than a project.

The nearest big cloud is two countries away

The large public clouds run their nearest full regions in Cape Town and Johannesburg. Their nearest edge locations are in Nairobi, on the far side of a border crossing at Malaba or Busia. That gap is why a Ugandan operator still gets a real, structural advantage from owning equipment in Kampala rather than renting capacity a border or two away.

The workloads that will not travel

RADIUS and AAA, recursive resolvers, authoritative zones, mail relays, billing and provisioning, NetFlow collectors, IPAM, looking-glass and speed-test nodes, USSD gateways answering feature phones. Roughly a third of Uganda's 58.3 million active device connections are smartphones; the rest are feature and basic phones, which is why session-based workloads are ordinary Ugandan production here. All of it is meaningless outside the country it serves.

Payments

Settling a rack contract in shillings

Uganda is mobile-money-first and, unlike its neighbours, a two-wallet country: the UCC counted 37.8 million active mobile money users in the quarter ending June 2026 from a registered base of 58.7 million, moving 2.55 billion transactions in three months, split between MTN Mobile Money and Airtel Money rather than concentrated in one brand. Behind the wallets sit the Bank of Uganda's rails — UNISS for high-value interbank settlement, and the Kampala Automated Clearing House for electronic funds transfers and direct debits. A rack contract is a treasury payment, so the ordering here is the inverse of the wallet story, but all four rails are open and all four settle in shillings.

Bank transfer, for the contract itself

The rail a Kampala finance office reaches for on anything invoiced, and the natural one for a footprint quoted monthly on a multi-year term. It sits comfortably above wallet limits, it lands with a reference your accounts team can reconcile, and it keeps a rack contract in the same category as every other domestic supplier payment you make.

MTN Mobile Money and Airtel Money

Both wallets, in shillings, for a single-U footprint, an incidental or a smaller recurring line. Two networks hold more than 90% of Ugandan subscriptions between them, so a checkout supporting only one of them would be asking about half the country to find another rail.

Card, if that is how your team buys

Visa and Mastercard work, in shillings — so no international transaction appears on the statement and no bank adds a foreign-transaction fee. Card use in Uganda concentrates in the urban banked segment; on a contract this size it is here for the finance teams that prefer the audit trail.

Quoted figures exclude VAT; Ugandan VAT of 18% is added on the invoice.

What's included

Built like a data centre, because it is one

Power, cooling, security, and connectivity engineered for uptime — the layers that are hard and expensive to build yourself, ready for your hardware to move into.

Redundant A+B power

Dual power feeds and UPS-backed distribution keep your equipment running through faults.

Resilient cooling

N+1 cooling and hot/cold-aisle containment hold temperature steady under full load.

Carrier-neutral connectivity

Reach multiple upstreams and peers — you're not locked to a single network.

Cross-connects

Direct physical links to carriers, peers, and your other cabinets within the facility.

Local IP transit

Blended, low-latency IP transit on the continent, with allowances that scale to your rack.

24/7 remote hands

Our on-site engineers reboot, recable, and install on your behalf, any hour.

Physical security

Access control, CCTV, and staffed facilities with audited entry to your space.

Free DDoS protection

Network-layer mitigation on your Lineserve transit at no extra cost.

Monitoring & reporting

Power, environmental, and network monitoring, with visibility into your footprint.

Regions & facilities

Tier III space, where you need it

Place your hardware in the metro closest to your users and keep your data in-country. carrier-neutral connectivity, Tier III facilities.

Live

Kenya

Nairobi · ke-1a

~2 ms

typical, within metro

Tier III, carrier-neutral

Live

Tanzania

Dar es Salaam · tz-1a

~6 ms

typical, within metro

Tier III, carrier-neutral

Live

Nigeria

Lagos · ng-1a

~4 ms

typical, within metro

Tier III, carrier-neutral

Expansion zonesSouth Africa · za-1aGhana · gh-1a

Space availability varies by region — reservations are confirmed with our team.

Move in, your way

Ship it, rack it, connect it

Whatever your hardware, we make space for it. Choose your footprint, power configuration, and connectivity, and our team handles the install so your equipment is racked, powered, and online.

Space

From a single U to quarter, half, and full racks, up to private cages and suites.

Power

Single or redundant A+B feeds, sized in kW, metered fairly above your allowance.

Connectivity

Cross-connects to carriers and peers, plus blended local IP transit that scales.

Hands & logistics

Shipment receiving, racking, cabling, and 24/7 remote hands, handled for you.

Migrating an existing setup? Tell us your rack layout and power draw and we'll plan the move.

Talk to Sales

Use cases

Why teams colocate with us

Data sovereignty

Keep regulated or sensitive data physically in-country, on hardware you own and control.

Disaster recovery

Stand up a resilient DR or backup site in a second region, close but independent.

Edge & network POP

Place equipment near your users or peering points to cut latency and transit cost.

Own-hardware economics

Run capital hardware you already own in a facility you don't have to build.

How it works

From shipment to online

1

Reserve your space

Choose a region, footprint, power, and connectivity, and we confirm availability.

2

Ship your hardware

Send your equipment to the facility; our team receives, racks, and cables it.

3

Connect & go live

Cross-connects and IP transit are provisioned, and you manage it remotely from there.

Power & network SLA

99.9%+

  • Redundant A+B power and N+1 cooling, monitored around the clock
  • 24/7 remote hands for reboots, recabling, and installs
  • Service credits applied automatically when we miss the SLA

Support & reliability

Uptime engineered, hands on-site

Redundant power and cooling in Tier III facilities, backed by a 99.9%+ power and network SLA, with 24/7 remote hands. Reach a real engineer in your region and timezone.

Which do you need?

Own the hardware, or rent it

Both put your workload in our Tier III facilities, on our network, with local billing and support. The difference is who owns the servers. Here's how to choose.

What mattersColocationDedicated Servers
Hardware ownershipYou own itWe own it
Upfront costYour capital hardwareNone — monthly only
Control over specTotal — it's your gearHigh — configured to order
Hardware maintenanceYours (with remote hands)Ours, under SLA
Power & coolingIncluded, redundantIncluded, redundant
ConnectivityCarrier-neutral cross-connectsBlended local transit
CommitmentTerm commitmentMonthly to term
Best forOwned hardware, sovereignty, DRFast bare metal, no capex

The quote

What we need from you, and what you get back

Colocation is quoted rather than listed, because two customers with the same rack count rarely want the same thing. What moves the number is footprint, power, connectivity and term, so those are what a first conversation covers. Footprints run from a single U for a box or two, through a quarter rack at 10U, a half rack at 21U and a full rack at 42U, up to private cages and suites for larger environments. Each footprint carries a power allowance sized to it, with draw above the allowance metered rather than guessed at, and A and B feeds on the larger footprints. Cross-connects are included from a quarter rack up, remote hands from a half rack up, and every footprint carries an IP transit allowance.

Send us an equipment list with the rated draw per unit, tell us how many U it occupies, whether you need A and B feeds, what you want cross-connected to, and how long you want the term to run. You get back a shilling figure, per month, that your finance team can put in a budget and your board can approve. A shilling quote matters more on a colocation contract than on anything else we sell, because the term is the longest: the number in the contract is the number on the invoice for the length of the contract, with no exchange-rate drift between signature and renewal and no conversion spread on the way. Prices exclude VAT; Ugandan VAT of 18% is added on the invoice.

Then the part unique to this country: getting the equipment here. Uganda has no port, so hardware bound for Kampala is entered through Mombasa or Dar es Salaam, moved roughly a thousand kilometres inland by road or rail, and cleared into Uganda at a border post — Malaba or Busia from the Kenyan side, Mutukula from the Tanzanian one. That is two customs jurisdictions, a freight forwarder, a clearing agent, duty and import VAT, and a week or more of a pallet sitting on a truck. It is also the step most likely to move your go-live date, and the one most likely to arrive with a bent rail or a dead controller. Start the paperwork before the boxes leave the supplier rather than after they arrive, decide early which corridor you are using, and tell us the shipment date, the packing list and the elevation. We plan the receiving, the rack-and-stack and the cabling around a real date instead of a hopeful one.

URA names web hosting, so the VAT position is not a debate

Uganda's standard VAT rate is 18%, administered by the Uganda Revenue Authority, with a registration threshold of UGX 150 million in annual taxable turnover. URA's published list of taxable electronic services opens with web hosting, ahead of software, streaming and online advertising, so there is nothing to interpret about the category. Have your TIN and your registered name exactly as URA holds it ready at quotation, and tell [email protected] what your finance team needs to see on the invoice while the contract is still being drafted rather than after the first billing run.

EFRIS, and why your procurement team asks about it

EFRIS is URA's real-time e-invoicing system, and it binds every VAT-registered business plus twelve designated sectors whether VAT-registered or not — information technology and communications among them. An EFRIS e-invoice carries a Fiscal Document Number, an Invoice Identification Number, a verification code and a QR code, and identifies the buyer by TIN, Business Registration Number or National Identification Number. URA treats a VAT credit claimed on purchases unsupported by an e-invoice as non-compliance, which is why supplier documentation on a multi-year contract is a procurement question long before it is an accounting one. Raise it at the quote.

Withholding, before your CFO raises it

Sections 83 and 84 of the Income Tax Act charge 15% on the gross of certain international payments and of payments to non-resident service providers, subject to treaty relief, and from 1 July 2025 a 15% final withholding tax applies to income non-residents derive from digital services supplied to users in Uganda. A VAT-registered buyer also accounts for VAT on imported services itself, under the reverse charge, rather than paying it to the supplier. Lineserve invoices Uganda from LINESERVE, INC. On a multi-year rack contract that is a cash-flow question rather than a footnote, so settle it with your tax adviser before signature and bring us into the conversation — the invoicing can be set up to match how you remit.

Tax treatment depends on your own registration and circumstances; your adviser is the one who signs it off. Talk to [email protected] for a footprint quote.

Data residency

The hardware is yours; the jurisdiction is the point

Uganda's Data Protection and Privacy Act, 2019 — now Chapter 97 of the Laws of Uganda — commenced on 3 May 2019, with implementing Regulations from March 2021. The regulator is the Personal Data Protection Office, which sits inside NITA-U and has been operational since August 2021. Section 29 and the Regulations require every data collector, processor and controller to register with the Office, registration runs one year and is renewed within three months of expiry, and failing to register is an offence.

What sets Uganda apart is the reach of that duty and the fact that it has been exercised. The registration obligation binds entities in Uganda and entities outside Uganda that collect or process Ugandan citizens' personal data. On 18 July 2025 the Office decided a complaint against a foreign technology company with no Ugandan establishment and found it in breach on two counts — failure to register, and failure to evidence a lawful basis or compliance framework for transferring the complainants' personal data outside Uganda — ordering it to register within thirty days and to produce evidence of a compliant cross-border arrangement. The Office subsequently clarified that the obligations attach to any entity handling Ugandan citizens' personal data, present in the country or not, until a specific exemption is gazetted.

For a colocation buyer that lands squarely on the address of the rack. Section 19 permits personal data to leave Uganda where the destination country's protection is at least equivalent to the Act or where the data subject consents, and Regulation 30 requires consent for onward transfers. There is no per-transfer permit — but the Office expects records of the legal basis, the safeguards and the justification for every cross-border transfer, produced on demand during an audit, a compliance check or an investigation. Equipment in Kampala means that file does not need building for the data on it. Your machines hold Ugandan data under Ugandan law, in a building your own engineers can reach the same afternoon, in a jurisdiction your regulator already supervises.

Who is controller and who is processor

In colocation you operate the equipment and the software on it, which puts more of the processing in your own hands than a managed service would. Compliance stays yours: registration with the Office and its annual renewal, notices, lawful basis, and breach notification under section 23 — immediate, on reasonable belief of unauthorised access, with penalties reaching 245 currency points or up to 2% of annual gross turnover for a corporation. What Lineserve supplies is the physical location, the power, the cooling, the network and the people who can touch the machine.

Government is served elsewhere; the layer around it is not

Worth knowing if you sell into the public sector. Central government hosting is consolidated at NITA-U's National Data Centre, which provides hosting, disaster recovery and backup for government applications. The addressable colocation market in Uganda is the private layer around that — systems integrators, contractors, programme implementers, and firms that submit data into government systems rather than run them.

Who racks here

Who colocates in Kampala

ISPs, carriers and network operators

Two large mobile networks, a cluster of enterprise carriers and wholesalers — Roke Telkom, CSquared, Liquid, BCS Group, Tangerine, Paratus, Africell — a research network in RENU, and a state backbone operator, most of them clustered around the same Kampala interconnection points. What they colocate is routers and switches, RADIUS and AAA, recursive and authoritative DNS, mail relays, billing and provisioning portals, IPAM, looking-glass and speed-test nodes. These buyers read a traceroute before they read a marketing page.

Banks, SACCOs and Tier 4 microfinance

Uganda's regulatory stack has a shape of its own: the Bank of Uganda supervises the deposit-taking tiers, while the Uganda Microfinance Regulatory Authority licenses Tier 4 — SACCOs, non-deposit-taking MFIs, community institutions and moneylenders — under the 2016 Act. Core banking, member portals, agent-banking and USSD backends, month-end and dividend runs, wallet reconciliation. This segment usually owns its hardware for control reasons, has the least appetite of anyone for a question about where the records physically are, and has been inside the Bank of Uganda's cyber and technology risk guidelines since 1 December 2024.

Mobile money and fintech

Roughly 196 fintech startups sit behind Uganda's wallet ecosystem, and the ones that grow into their own hardware do it for the same reasons everywhere: an uncontended ledger, predictable IOPS, and control over the box that receives operator callbacks. Reconciling against two wallet providers rather than one is the Ugandan complication, and it is a good argument for equipment in the country the callbacks originate in.

NGOs and donor programmes

Structurally heavier in Uganda's buyer mix than in most markets, with a large international presence in Kampala and organisations registered under the NGO Act. Health and monitoring platforms, field data collection servers, offline-tolerant file sync, grant accounting and donor reporting. Two things shape how they buy: an annual budget cycle that a fixed shilling line fits neatly, and a data-protection obligation over beneficiary personal data that lands directly on the residency block above — the NGO Bureau has itself reminded organisations that they must register under the Act.

Oil, gas and the Albertine contractor economy

Tilenga in Buliisa, Kingfisher in Kikuube and the pipeline to Tanga have built a Kampala-headquartered contractor economy working out of Hoima. Contractor and local-content management, HSE and incident systems, procurement and tender portals, document control, telematics ingest from vehicle and equipment fleets, and site-to-Kampala aggregation over constrained links. Because the pipeline terminates in Tanzania, a company working the corridor has workloads in two Lineserve regions rather than one.

Universities and research institutions

RENU connects Uganda's universities and is one of the larger participants on the Kampala exchange fabric, at two 10G ports. Institutional repositories, learning platforms at term-start scale, student information systems, research data stores and e-library proxies — equipment institutions usually own outright, on a procurement cycle rather than a subscription, and would rather not run in a campus comms room.

Anyone still running production from a comms room

The most common conversation on this page. The equipment is usually fine; the room is the risk. Electricity distribution passed from Umeme to UEDCL on 1 April 2025 and the transition brought persistent outages traced to inherited assets — transformers replaced by the hundred in a month, a backlog of tens of thousands of deteriorated poles — with tariffs above UGX 600 per kilowatt-hour pushing businesses onto generators. One feed, one air conditioner, a battery bank nobody has load-tested, and a door whose key lives with whichever member of staff has it today. Moving the same boxes into a data centre changes the failure model without buying a single new component.

Moving in

Out of the office, or back into the country

From your own server room

The hardware is rarely the problem. The building is. One power feed behind a distribution network still working through an inherited backlog, one air conditioner, a UPS nobody has load-tested since it was commissioned, an access door whose key travels home in somebody's pocket, and an alarm that goes off at midnight in an empty office in Kampala. Moving the same equipment into a data centre changes the failure model and the access model in one step, and it is a short move: the boxes are already in the country, already cleared, already yours. Send us a rack elevation, the power draw per unit and a list of what talks to what, and the move gets planned around them — a date, a shipment across town, engineers receiving and racking your equipment, cabling and labelling, then a checked power-up and a cutover window you choose. You keep the hardware, the configuration, the operating systems and the data. What changes is who is responsible for the power at three in the morning.

From a rack outside Uganda

Plenty of Ugandan equipment sits in Nairobi, Johannesburg or Europe, sometimes for good engineering reasons and sometimes because that is where a supplier had space in the year it was bought. Bringing it home is a real logistics exercise in a landlocked country — an export from where it sits, a coastal entry at Mombasa or Dar es Salaam, a thousand kilometres inland, a clearance at Malaba, Busia or Mutukula — so it is worth doing once, deliberately, with an agent who has run the corridor before. What you get at the other end is not sentimental. Your Ugandan users stop paying an overland haul and an ocean crossing on every request. Your invoice arrives in the currency you earn in. The personal data on the machines is in Uganda, so the section 19 records the Personal Data Protection Office may ask to see do not need to exist for it. And an engineer can stand in front of the hardware today rather than after a flight.

Building the power and cooling yourself is the real alternative to this page, and it is a fair comparison: a generator, a UPS, a cooling plant and someone to maintain all three, against a monthly shilling line item. Send [email protected] your equipment list, power draw and term and we will quote the footprint.

FAQ

Questions, answered

Rack space, redundant power up to your allowance, cooling, physical security, and a network port with an IP transit allowance. Cross-connects and remote hands are available, bundled on larger footprints.

Yes. Ship your equipment to the facility and our team receives it, racks it, cables it, and brings it online. Remote hands handle changes after that.

Each footprint includes a power allowance — 500 W on a quarter rack, 1 kW on a half rack, 3 kW on a full rack. Draw above the allowance is billed at $500 per kW per month, and larger footprints include redundant A+B feeds.

Yes. You can cross-connect to multiple carriers and peers, or use our blended local IP transit — you're never locked to a single upstream.

Yes. That's a core reason teams colocate with us. Your hardware and data stay physically in the region you choose, on the continent.

Colocation is offered on standard commitment terms that scale with your footprint. Talk to sales for terms on quarter, half, full racks, and cages.

Yes. Connect colocated hardware to Lineserve Cloud Servers, Dedicated Servers, and Object Storage over private networking within a region for a hybrid setup.

In Kampala, in our ug-1a region — the city where Uganda's international routes converge and where the Ugandan networks interconnect.

Colocation is quoted rather than listed, because footprint, power draw, connectivity and term all move the number. Send [email protected] an equipment list with the rated draw per unit, the space it occupies, what you want cross-connected, and how long you want the term to run, and you will get a shilling figure per month. Quoted figures exclude VAT; 18% is added on the invoice.

From a single U for a box or two, through a quarter rack at 10U and a half rack at 21U, to a full rack at 42U — and private cages and suites for larger environments. Each footprint carries a power allowance sized to it, with draw above the allowance metered rather than estimated.

Larger footprints take A and B feeds, so a single feed failure does not take your equipment down. Your quote states the allowance for the footprint you take and how draw above it is metered — send the rated draw per unit and it is sized from that rather than guessed at.

Plan the corridor first, because Uganda has no port. Hardware is entered through Mombasa or Dar es Salaam, moved roughly a thousand kilometres inland by road or rail, and cleared into Uganda at Malaba, Busia or Mutukula — two customs jurisdictions, a freight forwarder, a clearing agent, duty and import VAT. Start the paperwork before the boxes leave the supplier. Then tell us the shipment date, the packing list and the rack elevation, and our engineers receive it, rack it, cable it and label it.

Longer than a coastal country, and it varies with the corridor, the season and the completeness of your paperwork, which is exactly why the paperwork is the part to start early. Your clearing agent gives you the realistic window; we plan the receiving and the rack-and-stack around the date they give you rather than around an estimate.

The physical work you would otherwise drive across Kampala for: reboots, reseating a drive or a card, swapping a failed part you have couriered in, recabling, moving a cross-connect, and racking new equipment. Remote hands are included from a half rack up and available on smaller footprints.

Yes, by arrangement and against an access list you control. Access is one of the two things colocation actually changes about your operating model — the other being who is responsible for the power at three in the morning — so it is worth agreeing the list and the notice period when the contract is drafted.

MTN Mobile Money, Airtel Money, bank transfer or card, all in shillings. A rack contract is a treasury payment and most Ugandan finance teams settle it by transfer, which sits above ordinary wallet limits and lands with a reference the accounts team can reconcile.

Because colocation has the longest term of anything we sell, and a foreign-currency figure turns a fixed contract into a variable one. Quoted in shillings, the number in the contract is the number on the invoice for the length of the contract — no exchange-rate drift between signature and renewal, no conversion spread, and a budget line your finance team can defend without an FX assumption underneath it.

Your TIN and your registered name exactly as URA holds it, plus any purchase-order reference, given at quotation rather than after the first billing run. URA's published list of taxable electronic services names web hosting explicitly, so the VAT position is settled; what is left is documentation, and on a multi-year contract that is a procurement conversation. Tell [email protected] what your fiscal flow needs while the contract is being drafted.

Possibly, and on a multi-year contract it is a cash-flow question rather than a footnote. Sections 83 and 84 of the Income Tax Act charge 15% on the gross of certain international payments and payments to non-resident service providers, subject to treaty relief, and from 1 July 2025 a 15% final withholding tax applies to income non-residents derive from digital services supplied to users in Uganda. Lineserve invoices Uganda from LINESERVE, INC. Settle the treatment with your tax adviser before signature and copy [email protected] so the invoicing matches how you remit.

Yes. Equipment in ug-1a is in Kampala, and the data on it is in Uganda — which gives you data residency for Uganda's Data Protection and Privacy Act. Nothing on your machines moves out of the country unless you move it.

Compliance is yours, and in colocation more of it is yours than in a managed service, because you operate the equipment and the software. Registration with the Personal Data Protection Office and its annual renewal, notices, lawful basis and breach notification under section 23 all stay with you. What Kampala gives you is residency: the personal data stays in Uganda, so the section 19 cross-border analysis and the transfer records the Office may inspect do not arise for it.

Yes. Kampala, Nairobi, Dar es Salaam and Lagos are all live, on one account and one bill, which is a straightforward way to build a standby site or a second point of presence. Treat personal data deliberately when you replicate: a copy of Ugandan personal data in another country is a transfer outside Uganda under section 19, and the justification for it is something the Office may ask to see.

Through [email protected] and the ticket system on your account. Uganda runs on East Africa Time, UTC+3, all year with no daylight saving — the same clock as Nairobi and Dar es Salaam, and two hours ahead of Lagos, which is worth knowing when you schedule a maintenance window across sites.

Move your hardware closer to home

Tier III space, redundant power, carrier-neutral connectivity, and hands on the ground — with your data kept in-country and billed in local currency.

99.9%+ power SLA · Carrier-neutral · Data stays in-country